1. Prepare sub-base 2. Fix kerbstones on the
side of paving area


 
3. Evenly spread the layer of
sand over the sub-base
4. Lay and interlock paver block


 
5. Vibrate the laid surface 6. Remove excess sand
 
 
 
Home About Us Feedback Form Contact Us Site Map